Quality Assurance & Testimonials

Rache Corporation is certified to ISO 9002 per EC Directive Module A and ISO/FDIS 9000-2000 (E) section 2.8.2

 

Testimonials

Bioplate, Inc.

Throughout our complicated R&D process, Rache engineers were willing and involved partners. We implemented several of their suggestions which resulted in cost reductions and processing time. Rache’s service is distinctive, they respond to our needs for short runs with quick turn-around. Bioplate is going through the ISO 9000 process and we want to use Rache as our vendor example.

-- Carol Jones, Vice President of Operations

Saunders & Associates:

We have been pushing Rache’s manufacturing limits to the fine points of what can be done with a laser, trying to see just how small can you really get and still hold the spec. Rache engineers never over-promise, they are always up front about what they can do -- repeatedly produce very small, precise rectangular holes. They make my job easy because they are easy to deal with.

-- Derek Langham, Purchasing

Channel Microwave:

"Rache looks out for us. Over the last two years, they have occasionally assisted us with drawing clarifications which has helped their process and shortened our inspection time. Due to their commitment to quality, we anticipate awarding Rache with a "dock to stock" status with our company."

-- Bonnie Murray, Quality Assurance Manager

Saes Parker :

"Rache participates in our R&D process. Rache engineers were able to perfect a marking method for powder-coated parts using variable laser speeds that met our quality specs. Had we tried the same project, I’m sure we would have ended up with a lot of scrap in-house.

We don’t even want to consider looking for another vendor."

-- Carol Miller, Purchasing

Aseptico:

Machining easily read serial numbers on Aseptico electronic dental equipment parts is difficult because they are anodized black, but Rache had no problem achieving our design specifications.

We work with a myriad of production dates from multiple fabrication shops. Once the parts hit our dock, I call Rache for a turn-around date, they have always hit the mark.

When we find ourselves in a crunch situation, Rache always helps out with at least partial delivery in 24 hours.

-- John Middaugh, Purchasing Agent